Project Dashboard — Weekly Status Report
One-page executive summary covering schedule, cost, risks, and action items. Designed for weekly distribution to clients and senior leadership.
Templates, tools and guides across the full construction PM lifecycle. Filter by discipline, search by keyword, download instantly — no signup required.
★ Full Library — All 31 templates·Launch Price: $78·Normal $197
View Bundles →Day-to-day site management tools: daily reports, monthly reports, snag lists and handover packs.
One-page executive summary covering schedule, cost, risks, and action items. Designed for weekly distribution to clients and senior leadership.
Zoned defects register with photo placeholders and sign-off.
Pull-planning compatible weekly look-ahead with PPC tracking.
Topic, hazards discussed, attendees and sign-off.
Governance, dashboards, reporting cadence and steering pack templates for project management offices.
One-page executive summary covering schedule, cost, risks, and action items. Designed for weekly distribution to clients and senior leadership.
Three-level construction work breakdown structure with control accounts.
Trade-by-trade scope and interface clarification matrix.
EVM tracker, cost control log, schedule baseline workbook and integrated reporting cadence.
PV, EV, AC, CPI, SPI, EAC, ETC, TCPI and VAC with charts.
Commitments, accruals, forecast at completion and variance.
Activity list, durations, dependencies and resource loading worksheet.
Three-level construction work breakdown structure with control accounts.
Register, heat map, response strategy and quantitative contingency modelling.
Probability × impact register with owner, trigger and response.
5×5 heat map with auto-positioning from the register.
Budget vs actual, change order log, EAC forecast and cash flow.
Commitments, accruals, forecast at completion and variance.
Numbered change register with status, cost and time impact.
PV, EV, AC, CPI, SPI, EAC, ETC, TCPI and VAC with charts.
Prequalification, scope matrix, RFI log, submittal log and tender evaluation.
Financial, technical, safety and capacity screening.
Trade-by-trade scope and interface clarification matrix.
Numbered RFI register with response SLA and aging.
Submittal register with required-by dates and review status.
Variation orders, payment certificates, EOT logs and contractual correspondence templates.
Numbered change register with status, cost and time impact.
Numbered RFI register with response SLA and aging.
Submittal register with required-by dates and review status.
Inspection and test plans, non-conformance reports, handover defects and ITP checklists.
Inspection and Test Plan template aligned to NZS / AS / BS.
Zoned defects register with photo placeholders and sign-off.
Safe work method statements, toolbox talks, incident reports and safety inductions.
Editable SWMS template aligned to NZ HSWA 2015.
Topic, hazards discussed, attendees and sign-off.
Incident, near-miss and investigation template.
Daily reports, look-aheads, snag closure and site instruction logs.
Pull-planning compatible weekly look-ahead with PPC tracking.
Zoned defects register with photo placeholders and sign-off.
Topic, hazards discussed, attendees and sign-off.
One-page executive summary covering schedule, cost, risks, and action items. Designed for weekly distribution to clients and senior leadership.
WBS, schedule baseline, three-week look-ahead, pull plan and milestone trackers.
Three-level construction work breakdown structure with control accounts.
Activity list, durations, dependencies and resource loading worksheet.
Pull-planning compatible weekly look-ahead with PPC tracking.
Digital sticky-note pull plan with milestone constraints.
PMBOK-aligned project charter, stakeholder register, scope matrix and management plans.
Trade-by-trade scope and interface clarification matrix.
Three-level construction work breakdown structure with control accounts.
Probability × impact register with owner, trigger and response.
Lessons-learned register, after-action review and root-cause capture templates.
One-page executive summary covering schedule, cost, risks, and action items. Designed for weekly distribution to clients and senior leadership.
Process-step VSM template with lead-time and value-add.
Monthly cost reports, cash flow forecasting, payment claims, LD tracking and final account — FIDIC Sub-Clause 14 and NZS 3910 aligned.
Executive summary, work-package cost breakdown, and payment claims tracker — FIDIC / NZS 3910 aligned.
12-month S-curve with planned vs actual expenditure, retention modelling, and cumulative cash flow gap.
LD exposure calculator, EOT register with FIDIC 8.4 grounds, and net LD payable formula. FIDIC Clause 8.7.
FIDIC Sub-Clause 14.11 final account structure — Contract Sum, Variations, Claims, Deductions, and Balance Due.
FIDIC Sub-Clause 14.3 monthly progress statement with claimed, previously certified, and cumulative columns.
Practical completion checklist, O&M manual register and defects liability period tracker — FIDIC Clause 9–11 and NZS 3910.
36-item checklist across Structural, MEP, Architectural, Documentation, HSE, and Commercial — FIDIC Clause 9–11.
21-document Operations & Maintenance manual register across 5 volumes with approval status tracking.
FIDIC Clause 11 DLP defect tracking — priority, notice status, re-inspection result, and retention release.
RAID log, stakeholder register and decision & lessons learned log — PMBOK 7th Edition and ISO 21502.
Risks, Assumptions, Issues and Dependencies register with type colour-coding, priority, and COUNTIF summary.
10-stakeholder register with influence/impact scoring, engagement level matrix, and strategy — PMBOK 7th Ed.
Two-sheet workbook: Decision Log with options and rationale, and Lessons Learned Register — PMBOK 7th Ed.
The library expands monthly. Tell us what's missing and we'll prioritise it.
Request a template