Blog

Articles from the field

Long-form, practitioner-written pieces on construction project management. No fluff, no SEO padding.

Contracts & Commercial

Types of Project Delivery Methods in Construction — and How to Choose the Right One

A practical guide to construction project delivery methods — Design–Bid–Build, Design & Build, EPC, Construction Management, Management Contracting, ECI, IPD, Alliancing and PPP. Who carries which risk, which projects each method suits, and real examples from Sydney to Heathrow to Auckland.

16 Sep 2026Read
PMO & Governance

How a PMO Earns Its Keep on a Construction Project

What a construction PMO actually delivers — the three PMI models, owner-side versus contractor-side, the eight things a good PMO does, why most fail, and five tests for whether yours is working.

4 Sep 2026Read
Contracts & Commercial

Types of Construction Bonds — and When Each One Actually Applies

A practical guide to construction bonds across the project lifecycle — bid, performance, advance payment, retention, payment and defects liability bonds. On-demand vs conditional, typical values, expiry management and the mistakes that cost real money.

2 Sep 2026Read
Cost Control

Why Earned Value Management (EVM) Matters in Construction

Why “percent of budget spent” hides problems until it’s too late, and how three simple numbers — PV, EV and AC — give construction teams weeks of early warning. Worked examples, CPI/SPI, forecasting and three real case studies.

18 Aug 2026Read
Contracts & Commercial

How to Manage Your Construction Contract Successfully

A practical guide to construction contract administration — the six-step cycle from RFI to payment certificate, notice discipline, variations, extensions of time and claims, mapped against FIDIC 2017 and NZS3910:2013.

18 Aug 2026Read
Risk Management

How to Manage Risk in Your Construction Project Using the PMBOK® Guide Approach

A practical guide to construction risk management using the PMBOK® Guide approach — plan, identify, analyse, respond, implement and monitor risk, with a sample risk register, RBS, probability and impact matrix, and real site examples.

6 Aug 2026Read
Contracts & Commercial

Managing Extension of Time (EOT) Claims & Variation Orders: Practical Tips for Construction Professionals

A practical guide to Extension of Time (EOT) claims and Variation Orders under FIDIC 2017 and NZS 3910 — common mistakes, best practices, and a comparison table for construction professionals.

16 Jul 2026Read
Digital Construction

Advantages of Adopting AI in Managing a Construction Project

A practitioner's view of where AI genuinely improves construction project delivery — from predictive scheduling and cost forecasting to safety monitoring and document intelligence — and the conditions that make adoption pay off.

30 Jun 2026Read
Document Control

How to Manage the RFI in Your Construction Project

A practical guide for construction project managers on running the RFI process — from drafting and register discipline to FIDIC timeframes, escalation, and linking RFIs to the programme.

23 Jun 2026Read
Digital Construction

Where AI Actually Helps in Project Controls (and Where It Doesn't)

A grounded view from the field on which AI use cases are paying back this year on construction projects, and which are still demos.

2 May 2025Read
Cost Control

Earned Value Management on Real Construction Projects | Triangle PM

How to set up Earned Value Management on site, the metrics that actually move the needle, and the reporting cadence that keeps owners confident.

12 Apr 2025Read
Lean Construction

The Last Planner System Without the Jargon

A practical walkthrough of pull planning, make-ready, weekly work plans and PPC — what to do on Monday morning to get started.

21 Mar 2025Read
Risk

Building a Risk Register That Actually Gets Used

Most risk registers die in month two. Here is the format, cadence and ownership model that keeps risk live on a construction job.

14 Feb 2025Read
Schedule

Five CPM Scheduling Mistakes I See on Every Audit

Open-ended activities, missing logic, hammock relationships, lag abuse and constraint hardcoding — and how to fix each one.

30 Jan 2025Read
Procurement

The Subcontractor Procurement Checklist I Use on Every Package

Pre-qualification, scope clarity, programme alignment, payment terms and back-charge protection — the items that prevent the call at 11pm.

18 Dec 2024Read
Quality

Handover Defects: A Building Surveyor's View on Prevention

The defects I see most often at practical completion and the upstream decisions that would have prevented them.

9 Nov 2024Read
HSE

Toolbox Talks That Crews Actually Listen To

Why most toolbox talks fail and a simple format that turns them into a genuine safety conversation.

22 Oct 2024Read
Reporting

What Belongs in a Monthly Project Report (and What Doesn't)

Sponsors do not read long reports. Here is the one-page-plus-appendices structure that respects their time and keeps decisions moving.

15 Sep 2024Read
Cost Control

Change Management on a Live Construction Project

A clean change control process keeps the programme honest and the relationship with the client intact. Here is the workflow.

4 Aug 2024Read
Digital Construction

A Lean Digital Construction Stack for Small and Mid-Size Contractors

You do not need a million-dollar tech stack to run a digital site. Here is the toolset that works for projects up to NZD 50m.

19 Jul 2024Read
Schedule

Interface Management on Multi-Package Programmes

When five contractors share a footprint, interface management is the project. A simple register and a weekly forum keep it under control.

8 Jun 2024Read